CheckSumTech Insights Ideas for the Digital Enterprise
🔍 Search All Articles Generative AI Cloud Digital Transformation Compliance Data & Analytics
CMMC POA&M rules
🔐 Compliance · ·

CMMC POA&M Rules: What Can Go on One and the 180-Day Deadline

CMMC POA&M rules

A Plan of Action and Milestones, or POA&M, is the list of requirements you haven't met yet and your plan for fixing each one. Under CMMC you can sometimes hold a Level 2 status while a few items are still open, but the rule that allows it is narrow. Plenty of companies assume they can put anything on a POA&M and are surprised to find that they can't.

88Minimum score of 110 (80%) to be eligible for conditional Level 2
180Days after the conditional status date to close every open item

What the rule allows

32 CFR 170.21 sets the conditions. For Level 2, whether you assess yourself or a certified third party assesses you, you can reach conditional status with a POA&M only if all three of these are true:

  • Your score is at least 80% of the total. With 110 requirements, that means 88 or higher.
  • No item on the POA&M is worth more than 1 point. The one exception is FIPS-validated cryptography (3.13.11), which may be on the POA&M at its reduced 3-point value if you use encryption that isn't FIPS-validated.
  • None of the excluded requirements are on it. Six requirements can never be deferred, listed below.

Level 1 is stricter still. The rule says no POA&M is permitted for Level 1 at any time.

The six requirements that can't go on a POA&M

RequirementWhat it covers
3.1.20External connections to your systems
3.1.22Controlling publicly posted information
3.12.4The System Security Plan
3.10.3Escorting visitors
3.10.4Physical access logs
3.10.5Managing physical access

The System Security Plan on that list is the one that catches people. You can't plan to write an SSP later. It has to exist when you are assessed.

"A POA&M doesn't earn you points. It only lets you hold a conditional status for 180 days while you finish the work."

What the 180 days means

The clock starts on the conditional status date. Within 180 days you have to close out every item on the POA&M. The closeout assessment covers only those items, not the whole 110 again. If you are doing a self-assessment, you perform the closeout yourself the same way you did the original and post the result in SPRS. If you have a third-party assessment, a certified assessor does it. Miss the deadline and the conditional status expires.

Also keep in mind that unimplemented requirements are scored as not met whether or not a POA&M describes them. The POA&M changes what status you can hold while you finish. It doesn't change your score.

Three quick checks

  • A company scores 92 and has three 1-point items open. That is eligible: it clears 88, and nothing on the list is worth more than 1 point.
  • A company scores 87 with only 1-point items open. It is not eligible, because it is below the 88 line.
  • A company scores 95 but one of its open items is a 3-point requirement other than the FIPS exception. It is not eligible, because the item is worth more than 1 point. The total score doesn't matter.

If you aren't eligible, the way forward is to implement the blocking items first and reassess. Our guide to how the SPRS score is calculated shows how to see which gaps cost the most.

What a useful POA&M line contains

For each open item, write down the requirement number, what specifically isn't in place, the fix, who owns it, a target completion date, and the current status. Keep the dates inside the 180 days, because a plan that runs past the deadline is a plan to lose conditional status. Update the status as items close, so the closeout assessment is a check of work you have already finished rather than the start of it.

DoD suspended Phase 2 of CMMC, the phase that would have required third-party assessments, on July 13, 2026, while it reviews the program. As of November 12, 2026, self-assessment requirements continue. The POA&M limits above come from the current text of 32 CFR 170.21 and could change if the rule is revised. This article is general information, not legal advice. Check your own contract and ask your contracting officer or a government contracts attorney about your situation.

Building one without starting from a blank page

In ComplianceRadar, every requirement you mark as not met becomes a line in the POA&M editor, with fields for the fix, owner, target date and status. You can then download the finished POA&M as a Word document alongside the System Security Plan. The SPRS calculator and gap list are free, and the 7-day trial for the downloads doesn't need a card. The tool lists your open items. Whether they are eligible for a conditional status is something to check against the rules above.

Sources: 32 CFR 170.21, Plan of Action and Milestones requirements. 32 CFR 170.24, CMMC Scoring Methodology. Federal News Network, July 2026, on the Phase 2 suspension.

Share:

See your gaps and your score

Answer the 110 NIST SP 800-171 requirements and get your SPRS score and a gap list sorted by points lost. Free, with no signup needed for the score.

Open the Calculator